top of page


Government
Tampa Int'l Airport
Tampa, FL
Installation of new glass cladding on the exterior walls of the red and blue elevator cores located on the baggage claim and ticketing levels at Tampa International Airport. The scope of work included installation of approximately 10,250 square feet of exterior glass panel façade. Also included was demolition, electrical, technology and plumbing work required to accommodate the installation of the new cladding. Construction was located at an active airport curbside and as such, a high level of coordination of construction activities with airport operations was required.
Project Gallery